Floor Preparation
AS WITH MOST THINGS THE KEY TO A SUCCESSFUL FLOORING INSTALLATION IS IN THE PREPARATION. THE FLOOR SHOULD BE CLEAN, FREE FROM ANY CONTAMINANTS THAT MAY AFFECT ADHESION OF NEW FLOORING, DRY LEVEL AND SMOOTH. BELOW IS A LIST OF SERVICES OFFERED FOR ALL YOUR FLOORING PREPARATION NEEDS
1 REMOVAL OF OLD FLOOR COVERINGS
2 DAMP TESTING AND APPLYING OF NEW CHEMICAL DAMP PROOF MEMBRANE -DPM
3 SUPPLY AND APPLICATION OF LATEX LEVELLING SCREED
4 SUPPLY AND INSTALLATION OF HARDBOARD OR PLYWOOD FLOORING
LINKS
LAYBOND - www.laybond.com/general
F-BALL - http://www.f-ball.com/
ARDEX - http://www.ardex.co.uk/

